4th Floor, Trade Tower Nepal, Thapathali, Kathmandu, Nepal
Tadi khola, Nuwakot district, Bagmati province, Nepal
+977015111093
suryakundahydro@gmail.com

Suryakunda Hydroelectric Limited is the developer of the Upper Tadi Hydropower Project (UTHP), an 11MW run-of-river (ROR) project located in Nuwakot District, Nepal. The project was initially identified in 2006 with a planned capacity of 3MW, which was later upgraded to 11MW after feasibility studies.
© All Rights Reserved.

The company has successfully constructed and is commercially operating 11.0 MegaWatt, Mathilo Tadi Khola Hydroelectric Project a run off river type project in Tadi river, a tributary of Trishuli river located at Dupcheswor Rural Municipality, Nuwakot district of Bagmati Province in the central region of Nepal.