4th Floor, Trade Tower Nepal, Thapathali, Kathmandu, Nepal
Tadi khola, Nuwakot district, Bagmati province, Nepal
+977015111093
suryakundahydro@gmail.com
Suryakunda Hydroelectric Limited is the developer of the Upper Tadi Hydropower Project (UTHP), an 11MW run-of-river (ROR) project located in Nuwakot District, Nepal. The project was initially identified in 2006 with a planned capacity of 3MW, which was later upgraded to 11MW after feasibility studies.
© All Rights Reserved.