Skip to content
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact
Menu
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact

Suryakunda Hydroelectric Limited is the developer of the Upper Tadi Hydropower Project (UTHP), an 11MW run-of-river (ROR) project located in Nuwakot District, Nepal. The project was initially identified in 2006 with a planned capacity of 3MW, which was later upgraded to 11MW after feasibility studies.

Facebook Whatsapp
Quick Links
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact
Get In Touch
  • Email: suryakundahydro@gmail.com
  • Phone: +977-1-5111093

© All Rights Reserved.