Skip to content
Title Date
Ipo Open Notice February 1, 2026 Read Download
Prospectus December 16, 2025 Read Download
Announcement December 16, 2025 Read Download
AGM report 19th December 4, 2025 Read Download
19th AGM Notice November 6, 2025 Read Download
Progress Report Upper Tadi Khola May 25, 2025 Read Download

Suryakunda Hydroelectric Limited is the developer of the Upper Tadi Hydropower Project (UTHP), an 11MW run-of-river (ROR) project located in Nuwakot District, Nepal. The project was initially identified in 2006 with a planned capacity of 3MW, which was later upgraded to 11MW after feasibility studies.

Quick Links
  • Home
  • About us
  • Our Team
  • Reports
  • Blogs
  • Gallery
  • Contact
  • Home
  • About us
  • Our Team
  • Reports
  • Blogs
  • Gallery
  • Contact
Get In Touch
  • Email: suryakundahydro@gmail.com
  • Phone: +977-1-5111093

© All Rights Reserved.

  • Home
  • About us
  • Our Team
  • Reports
  • Blogs
  • Gallery
  • Contact
  • Home
  • About us
  • Our Team
  • Reports
  • Blogs
  • Gallery
  • Contact

Suryakunda Hydro Electric Limited

The company has successfully constructed and is commercially operating 11.0 MegaWatt, Mathilo Tadi Khola Hydroelectric Project a run off river type project in Tadi river, a tributary of Trishuli river located at Dupcheswor Rural Municipality, Nuwakot district of Bagmati Province in the central region of Nepal.

Ready for a Next Project?
CONTACT