| Title | Date | |
|---|---|---|
| Application Form | December 16, 2025 | Read Download |
| Prospectus | December 16, 2025 | Read Download |
| Announcement | December 16, 2025 | Read Download |
| AGM report 19th | December 4, 2025 | Read Download |
| 19th AGM Notice | November 6, 2025 | Read Download |
| Progress Report Upper Tadi Khola | May 25, 2025 | Read Download |

Suryakunda Hydroelectric Limited is the developer of the Upper Tadi Hydropower Project (UTHP), an 11MW run-of-river (ROR) project located in Nuwakot District, Nepal. The project was initially identified in 2006 with a planned capacity of 3MW, which was later upgraded to 11MW after feasibility studies.
© All Rights Reserved.