Our Reports
Title | Date | |
---|---|---|
Progress Report Upper Tadi Khola | May 25, 2025 | Read (142) Download (14) |
Title | Date | |
---|---|---|
Progress Report Upper Tadi Khola | May 25, 2025 | Read (142) Download (14) |
Suryakunda Hydroelectric Limited is the developer of the Upper Tadi Hydropower Project (UTHP), an 11MW run-of-river (ROR) project located in Nuwakot District, Nepal. The project was initially identified in 2006 with a planned capacity of 3MW, which was later upgraded to 11MW after feasibility studies.
© All Rights Reserved.