Skip to content
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact
Menu
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact

Our Reports

Title Date
Progress Report Upper Tadi Khola May 25, 2025 Read (142) Download (14)

Suryakunda Hydroelectric Limited is the developer of the Upper Tadi Hydropower Project (UTHP), an 11MW run-of-river (ROR) project located in Nuwakot District, Nepal. The project was initially identified in 2006 with a planned capacity of 3MW, which was later upgraded to 11MW after feasibility studies.

Facebook Whatsapp
Quick Links
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact
  • Home
  • About us
  • Reports
  • Blogs
  • Gallery
  • Contact
Get In Touch
  • Email: suryakundahydro@gmail.com
  • Phone: +977-1-5111093

© All Rights Reserved.